The basement support beam is usually the thing you hit your head on, not the joists. In most Toronto houses the beam and its posts hang four to ten inches below the joists, so a lowering that digs the slab down leaves the same beam in the same place. Replacing the beam with a shallower steel section, raising it flush into the joist space, or moving the posts is engineered structural work: the City of Toronto lists structural alterations and basement underpinning as permit-required, a licensed engineer designs the beam, and the job is done at the same time as the lowering so the new column footings go in with the new slab.
That is the short version of a conversation we have several times a month. Someone measures slab to joist, gets 6 feet 10 inches, reads that a lowering can take them to 7 feet 6 inches or more, and plans on that. Then they measure under the beam and get 6 feet 2 inches. The beam runs down the middle of the house, so it is in every room of the basement, and no amount of digging moves it. This page covers what can be done about it, who designs it, what the City requires, and how the work fits into basement lowering in Toronto.
We coordinate underpinning, lowering and the structural work that goes with it. We do not perform structural engineering. The size of a beam, the spacing of its posts and the footing under each post are set by a licensed Ontario engineer's design, never by this page, and we will not tell you on the phone what beam your house needs.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.
Why the beam, not the slab, sets your usable height
Every Toronto basement has three heights, and the lowering page explains how to measure them properly. The one that decides whether the finished basement feels like a floor of the house is the third: slab to the lowest thing hanging from the ceiling. In a house built before about 1970 that is almost always the main beam, with the trunk duct a close second.
The pattern by housing era is consistent across the city:
| House | Typical beam | What you find |
|---|---|---|
| Pre-1940 semis and rowhouses (Leslieville, Riverdale, the Danforth, Parkdale, the Junction) | Built-up wood beam, three or four 2x8s or 2x10s nailed together, on brick piers or a wood post | Deflected over 80 to 100 years, often notched for pipes, piers sitting on a slab or on nothing at all |
| 1920s to 1950s detached and semis (East York, Old Toronto, the Beaches, York) | Wood beam on wood or early steel posts, sometimes an early steel I-beam | Posts added or moved by previous owners, ad hoc footings |
| 1950s to 1960s bungalows and sidesplits (North York, Scarborough, Etobicoke) | Steel I-beam on adjustable steel posts, usually 8 inches deep | Sound beam, but the posts are often the thin adjustable kind, and the beam still hangs below the joists |
| 1970s onward | Steel beam on steel columns with proper footings | Usually fine as is; the height problem is the slab, not the beam |
Two things follow from that table. First, in the oldest houses the beam is often a structural question before it is a headroom question: a deflected wood beam on piers with no footings is something the engineer will want to look at regardless of what you plan. Second, in the post-war bungalow belt the beam is usually sound and the fix is purely about where it sits.
The slab-to-joist number is the optimistic one. The number under the beam is the one you live with. Ask the engineer about both before anyone quotes you a lowering.
The four beam jobs an engineer can design
There is no single "beam replacement". There are four distinct jobs, and the right one depends on the house, the height you want and whether you are lowering at the same time.
1. Replace a sagging or undersized beam. The old built-up wood beam comes out and a steel beam goes in, sized by the engineer for the span and the loads above. On its own this does not gain much height, because a steel beam deep enough for the span still hangs below the joists. It is done because the old beam is failing, or because the posts are coming out anyway.
2. Raise the beam flush with the joists. This is the headroom job. The new steel beam is set up inside the joist space and the joists are hung off its sides on hangers, instead of sitting on top of it. The underside of the beam ends up at or near the underside of the joists, and the slab-to-beam height becomes the slab-to-joist height. It is more work, because every joist that crossed the old beam has to be cut, supported and re-hung, and the engineer has to confirm the joists can be hung that way.
3. Replace temporary posts with permanent columns on footings. Adjustable steel posts are sold as temporary supports. In older houses they have been holding the beam up for decades, often standing on the slab with no footing under them. On a lowering they come out anyway, because the slab they stand on is being removed. The engineer designs permanent steel columns with a footing under each one, poured at the new, deeper level.
4. Remove or relocate posts to open the plan. Fewer, further-apart posts need a deeper or heavier beam. The engineer trades beam depth against post spacing. Where you want an open rec room, that trade is worth it; where the basement is becoming a suite with walls anyway, the posts can usually hide inside the partitions and the beam stays shallower.
Most lowering projects in Toronto end up with some mix of jobs 2 and 3: the beam goes flush, the temporary posts come out, and new columns on new footings go in with the slab.
When the beam work happens on a lowering
The beam work is not a separate project tacked on at the end. It is sequenced into the lowering, and the order matters because the house is being held up by temporary supports while its floor is being dug out.
- Engineer's design. The same engineer who designs the underpinning designs the beam, the columns and the column footings. The City's Residential Underpinning application guide requires the floor plans to show "locations of any support columns and structural framing above", so the beam and posts are on the permit drawings from the start.
- Temporary shoring. Before the old posts come out, the floor above is carried on temporary shoring set on the existing slab or on pads, placed where the engineer says. On a wood-beam house this is also when any deflection is relieved slowly rather than jacked in one go.
- Underpinning in sequence. The perimeter is underpinned in the numbered sections the drawings show, as on every job: see underpinning permits in Toronto for what the sequence drawing looks like and why the City inspects it.
- Column footings at the new depth. Once the floor is excavated, the footings for the new columns are formed and poured at the engineer's size and depth, in the same pour cycle as the rest of the sub-slab work.
- Beam and columns set. The new steel beam is set, flush or below the joists per the design, the joists are hung or re-bearing is made, and the permanent columns go in on their footings. The temporary shoring comes out only once the engineer is satisfied.
- Slab. The new slab goes in around the column bases, with the under-slab drainage and vapour barrier the design calls for.
Doing the beam later, after a new slab is down, means cutting that slab open for the column footings. That is why we raise the beam question at the first site visit rather than after the lowering is priced.
What the City of Toronto requires
A beam replacement is not a cosmetic renovation, and the permit rules treat it that way. Three City documents, read at source this month, set out what applies.
A building permit is required. The City's When Do I Need a Building Permit? page lists "structural or material alterations, such as adding or removing walls" and "basement underpinning" among permit-required work, and says that finishing a basement needs a permit when it includes structural alterations, underpinning, a basement entrance or a second suite. Finishing a basement with no structural or material alterations is on the exempt list. Changing the beam that carries the floor above is a structural alteration.
The drawings have to show the structure above. The Interior Alterations application guide requires floor plans showing "interior partitions and structural framing above", and cross sections showing floor-to-ceiling heights and foundation details. The Residential Underpinning guide adds the support column locations and the numbered underpinning sequence.
The engineer's role is spelled out. Where drawings carry an engineer's seal, the Interior Alterations guide requires a completed Assumption of Responsibility for Engineering Content form; drawings prepared by a qualified designer must show the designer's registration and qualification numbers. For the underpinning part, the City requires a Professional Engineer's design and on-site review when the new foundation goes below the footing of an adjacent building within the angle of repose of the soil, and, on every underpinning job, the engineer's testing and reports at the first and last stages of construction to pass inspection. The Commitment to General Reviews form is also triggered where the underpinning exceeds 1,200 mm of laterally unsupported height or the soil is clay or silt. What that means in practice, and what the engineer costs, is on our page about the underpinning engineer in Toronto.
Nothing in those guides prices the work, and neither does this page. What they do is make clear that a contractor offering to "swap the beam" without drawings, a permit or an engineer is offering something the City will not inspect and a future buyer's lawyer will ask about.
What the beam work costs, honestly
We do not publish a price for beam replacement, because there is no honest single number. The cost is the engineer's design plus the steel plus the labour to shore, cut, hang and set, and every one of those depends on the span, the loads above, how many joists cross the beam and whether the beam goes flush. A twenty-foot beam in a bungalow with the joists re-bearing on top is a different job from a forty-foot flush beam under a two-storey semi with a party wall.
What we can tell you is how it sits against the published figures on this site:
| Item | Published figure | Where the beam fits |
|---|---|---|
| Underpinning | $500 to $750 per linear foot of foundation wall | The beam and columns are not part of this rate |
| Engineering | $1,500 to $8,000 | The beam design is usually inside the same engagement as the underpinning design, at the upper end of the range when the beam goes flush and the joists are re-hung |
| City permit fee | $12.37 per linear metre of underpinning, $214.79 minimum (2026); the structural alteration is charged on the floor area affected under the City's residential alteration rate | On the permits page |
| Beam, columns, footings, shoring and labour | Quoted after the engineer's design | Not a number we will give on the phone |
If you are comparing quotes for a lowering, look for a line that says what happens to the beam and posts. A quote with no beam line is either leaving the beam where it is, which may be fine if you have measured under it and accepted the height, or it is a cost that arrives later. Our page on comparing underpinning quotes has the full itemisation to ask for.
When the beam is the whole job, and when lowering is
Not everyone who calls about a beam needs a lowering. The questions that sort it out are simple.
Measure under the beam and under the joists. If the joists are already at 7 feet 6 inches or better and only the beam is low, raising the beam flush may be the whole job. That is rarer than people hope in a pre-war house, where the joists themselves are usually at 6 feet 6 inches to 7 feet.
Ask what height you actually need. For a legal secondary suite, the figure commonly applied in Toronto is 1.95 metres (6 feet 5 inches), with some allowance under beams and ducts that depends on the clause your designer applies to your house; our page on a legal basement apartment in Toronto goes through it. For a family room, most people want more than the legal minimum, and the beam is the first thing that gets in the way of "more".
Ask whether the beam is sound. A deflected wood beam, a post standing on bare slab, a beam notched for a drain line: these are reasons to involve the engineer whatever you do with the floor. Do not rely on a photograph, a home inspector's note or this page for that call. The engineer looks at it in person.
If you are lowering anyway, do the beam now. The column footings and the slab are being rebuilt. Adding the beam work later costs you a second round of shoring and a cut slab.
The semi-detached complication
In a semi or a rowhouse the main beam often bears on the party wall at one end. Changing how the beam bears, or raising it, touches the wall you share. The City's Interior Alterations guide says that where a party wall is involved, a building permit must be issued for all the properties separated by it, with each application filed by that property's owner or agent. In practice that means the neighbour is part of the permit, not just a courtesy call. How the neighbour conversation runs, and why the underpinning sequence itself depends on it, is covered on underpinning a semi-detached house in Toronto.
Common questions
Can you lower a basement without replacing the beam?
Yes, and some projects do. The slab goes down, the perimeter is underpinned, and the beam stays where it is. You gain height everywhere except under the beam and the duct, which still hang at their old level. Whether that is acceptable depends on where the beam runs and what the basement is for; measure under it before deciding.
Does replacing a basement beam need a permit in Toronto?
Yes. The City's permit-required list includes structural or material alterations and basement underpinning, and says finishing a basement needs a permit when it involves structural alterations. The drawings must show the structural framing above and the support column locations.
Who designs the new beam?
A licensed Ontario engineer, usually the same one designing the underpinning. The beam, column spacing and footing sizes are their calculation. We coordinate the engineer, the permit and the contractor; we do not size the beam.
How much height does a flush beam add?
The difference between your slab-to-beam measurement and your slab-to-joist measurement, which in a Toronto house built before 1970 is typically four to ten inches. The engineer confirms whether the joists can be hung on the new beam's sides.
What are the adjustable steel posts in my basement?
Telescoping steel posts, sold as temporary supports. Many older Toronto basements have had them for decades, often standing on the slab without a footing. On a lowering they are removed because the slab goes, and the engineer designs permanent columns on footings to replace them.
How much does basement beam replacement cost in Toronto?
We do not publish a figure for the beam work, because it depends on span, loads, whether the beam goes flush and how many joists are re-hung. The engineering is inside the published $1,500 to $8,000 range on this site, and the underpinning is $500 to $750 per linear foot. The beam, columns and shoring are quoted after the engineer's design.
Is a sagging beam dangerous?
We will not judge that from a description or a photo, and neither should you. A deflected wood beam or a post with no footing is a reason to have an engineer look at it in person. The engineer decides what, if anything, needs to be done, and how soon.
Call (289) 207-6470 with your slab-to-joist and slab-to-beam measurements and the age of the house, or send the details below, and we will tell you whether the beam is likely to be part of your lowering and what the engineer will need to see.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.