Original data · City of Toronto Open DataToronto underpinning permits by ward, 2017 to 2026
Data downloaded November 6, 2026 · 8,838 permits · 25 wards
Since January 2017, Toronto residents have applied for 8,838 building permits whose description mentions underpinning. 72.5% of them are in six wards: Toronto-Danforth, University-Rosedale, Parkdale-High Park, Davenport, Beaches-East York, Toronto-St. Paul's. Applications fell about 25% after 2022, and the median wait from application to permit issuance was 13 days for 2025 applications. Here is every ward, sortable, with the method and the City datasets behind it.
Every ward, sortable
Click a column heading to sort. "Last 3 yrs" is 2023 to 2025 (complete years). Median days uses permits applied for since 2023, shown where a ward has at least 10.
| 14 | Toronto-Danforth | 1,464 | 366 | 47 | 475 | 9 |
|---|---|---|---|---|---|---|
| 11 | University-Rosedale | 1,158 | 271 | 31 | 395 | 17 |
| 4 | Parkdale-High Park | 1,129 | 299 | 32 | 290 | 12 |
| 9 | Davenport | 1,024 | 266 | 20 | 465 | 15 |
| 19 | Beaches-East York | 946 | 261 | 46 | 294 | 10 |
| 12 | Toronto-St. Paul's | 690 | 193 | 19 | 232 | 15 |
| 3 | Etobicoke-Lakeshore | 444 | 121 | 8 | 178 | 15 |
| 8 | Eglinton-Lawrence | 435 | 90 | 11 | 139 | 14 |
| 15 | Don Valley West | 421 | 94 | 17 | 130 | 20 |
| 10 | Spadina-Fort York | 235 | 49 | 5 | 83 | 9 |
| 5 | York South-Weston | 218 | 56 | 7 | 169 | 15 |
| 20 | Scarborough Southwest | 180 | 41 | 9 | 120 | 20 |
| 13 | Toronto Centre | 164 | 38 | 1 | 57 | 24 |
| 2 | Etobicoke Centre | 101 | 30 | 4 | 126 | 22 |
| 6 | York Centre | 37 | 12 | 1 | 54 | 38 |
| 16 | Don Valley East | 32 | 11 | 1 | 36 | 16 |
| 1 | Etobicoke North | 27 | 4 | 0 | 106 | n/a |
| 21 | Scarborough Centre | 26 | 8 | 1 | 96 | n/a |
| 25 | Scarborough-Rouge Park | 26 | 7 | 0 | 180 | n/a |
| 18 | Willowdale | 22 | 4 | 1 | 73 | n/a |
| 17 | Don Valley North | 21 | 6 | 2 | 58 | n/a |
| 22 | Scarborough-Agincourt | 14 | 4 | 1 | 69 | n/a |
| 24 | Scarborough-Guildwood | 13 | 5 | 0 | 91 | n/a |
| 7 | Humber River-Black Creek | 7 | 1 | 1 | 41 | n/a |
| 23 | Scarborough North | 4 | 1 | 1 | 78 | n/a |
| All Toronto | 8,838 | 2,238 | 266 | 4,035 | 13 (2025) |
Year by year, all of Toronto
| Application year | Underpinning | Basement lowering | Basement walkout | Median days to issue (underpinning) |
|---|---|---|---|---|
| 2017 | 1,024 | 30 | 453 | 17 |
| 2018 | 947 | 17 | 464 | 20 |
| 2019 | 979 | 15 | 498 | 23 |
| 2020 | 904 | 27 | 439 | 26 |
| 2021 | 1,060 | 26 | 512 | 29 |
| 2022 | 1,053 | 27 | 497 | 36 |
| 2023 | 742 | 34 | 298 | 23 |
| 2024 | 771 | 33 | 327 | 10 |
| 2025 | 725 | 24 | 304 | 13 |
| 2026 (to Nov 6) | 633 | 33 | 243 | 8 |
Planning underpinning in one of these wards?
We publish our range: $500 to $750 per linear foot, about $50,000 to $75,000 of structural work for a semi with 100 feet of wall. Tell us the house and the street and we will give you a straight range and the questions your engineer will ask.
What the data says
Underpinning is an old-city job. The six busiest wards, Toronto-Danforth (1,464), University-Rosedale (1,158), Parkdale-High Park (1,129), Davenport (1,024), Beaches-East York (946), Toronto-St. Paul's (690), cover much of the old City of Toronto and East York, where older semis, row houses and narrow detached houses dominate the streets. At the other end, 11 of the 25 wards, mostly in Scarborough, North York and north Etobicoke, logged fewer than 40 underpinning permits in almost ten years, and in 11 of those the basement walkout count is higher than the underpinning count.
Semis are a third of the work. 34.4% of the permits list a semi-detached structure, which is why the party wall is the part of the job most owners have to plan around. Our guide to underpinning a semi-detached house covers what the City asks for on an attached house.
Volume dropped after 2022. Applications averaged about 995 a year from 2017 to 2022 and about 746 from 2023 to 2025. The permit data does not say why. The timing follows the Bank of Canada's rate increases that began in March 2022, but that is context, not a finding of this count.
What it means for permit timing
The median time from application to issuance rose from 17 days for 2017 applications to 36 days for 2022 applications, then fell to 10 days for 2024 and 13 for 2025. A median hides the slow tail: an application with missing engineering, an unclear sequence or nothing on the adjacent foundation goes back for revisions and waits longer. The spread matters as much as the middle. For 2025 applications, 43% were issued within 10 days of application, a quarter took 30 days or more, 18% took six weeks or longer, and one in ten took 67 days or more (717 permits with both dates). For 2017 to 2022 applications the same figures were 22% within 10 days and 31% at six weeks or more. Three practical points for a homeowner:
- The permit is rarely the long pole now. On current medians the City's part is a few weeks. The engineer's drawings, the soils question and the contractor's calendar usually take longer, so start those first.
- A complete package is what keeps you near the median. The City's underpinning guide asks for numbered stages with the lineal metres of work and, where applicable, the distance to and depth of the adjacent building's footings. Our underpinning permits in Toronto guide lists what gets applications sent back.
- Your ward barely changes the permit clock. For applications since 2023, the median time to issue ranges from 9 to 24 days across the 14 wards with at least 30 permits to measure. Where you live changes how much underpinning is happening on your street far more than how long the City takes.
Method
We downloaded the City of Toronto's two building permit datasets on November 6, 2026: Building Permits, Active Permits (refreshed 2026-11-06 10:22) and Building Permits, Cleared Permits since 2017 (refreshed 2026-11-06 11:20). Then:
- Permits, not rows. Each permit number is counted once across both files and all its revisions.
- Building permits only. Permit numbers ending in BLD with permit type Small Residential Projects, Building Additions/Alterations or Residential Building Permit. Plumbing, drain and mechanical permits that mention the same job are excluded, as are new houses.
- Underpinning: a description (in any revision) containing "underpin" in any spelling, excluding explicit negations such as "no underpinning". Basement lowering: descriptions such as "lowering of the basement" or "basement lowering". Basement walkout: "walkout" or "walk-out" together with "basement" or "below grade". A permit can count in more than one column.
- Excluded: permits whose original record is cancelled or refused, and applications dated before January 1, 2017 (earlier closed permits sit in a separate file we did not use).
- Year is the application year. Ward is the two-digit ward number in the dataset's WARD_GRID field, which matches the City's 25-ward model (names from the City Wards dataset); we spot-checked it against permit addresses. Days to issue runs from application date to issued date on the original permit, where both exist.
Limits: a permit description is free text written at application, so some underpinning jobs described only as "structural alterations" are missed, and the count measures applications, not completed work. Contains information licensed under the Open Government Licence, Toronto.
Use this data
Journalists, councillors' offices and researchers are welcome to cite or reproduce these tables with a link to this page. The counts will be refreshed from the City's datasets periodically, with the download date shown at the top.
Frequently asked questions
Which Toronto wards have the most underpinning permits?
Toronto-Danforth, University-Rosedale and Parkdale-High Park lead the city, with 1,464, 1,158 and 1,129 building permits mentioning underpinning applied for since January 2017. The top six wards, all in the old City of Toronto and East York, account for 72.5% of the 8,838 permits.
How long does an underpinning permit take to be issued in Toronto?
For permits applied for in 2025, the median time from application to issuance was 13 days in the City's data, down from a peak of 36 days for 2022 applications. That is the median: drawings that need revisions take longer, and the clock starts only once an application is submitted.
Are underpinning permits going up or down in Toronto?
Down. Applications averaged about 995 a year from 2017 to 2022 and about 746 a year from 2023 to 2025, roughly 25% fewer. The 2026 figure (633) covers January 1 to early November only.
How many Toronto underpinning permits are for semi-detached houses?
3,042 of the 8,838, or 34.4%, list a semi-detached structure type (single-family or two-unit), and 55.6% list a detached house. Townhouses account for 468.
Related: underpinning cost in Toronto, the engineer's role, and our main page on basement underpinning in Toronto.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.