Basement underpinning in Markham costs $500 to $750 per linear foot of foundation wall on our published range, about $65,000 to $97,500 for a house with 130 feet of perimeter, before engineering, the permit and HST. The digging is the same as anywhere in the GTA. The rules around it are not: Markham issues its own building permits, charges its own fees, requires parking for a basement suite and protects four heritage districts.
That last point catches out a lot of people who read Toronto advice. Markham is a separate city with its own Building Standards Department, its own zoning by-law and its own fee schedule, so a Toronto permit fee, a Toronto subsidy or a Toronto parking rule does not carry over. The same is true of the stair: our guide to basement walkouts in Markham covers the entrance setbacks and the $498 permit line. The method itself, the alternating sections, the engineer's role and the sequence of a job, is covered in our guide to basement underpinning in Toronto. This page is about the Markham layer: who issues the permit, what it costs, the suite rules that decide whether lowering pays off, and the places where a dig needs more than a building permit.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.
Markham is not Toronto, and the paperwork shows it
A Markham underpinning job is permitted by the City of Markham Building Standards Department at the Civic Centre, 101 Town Centre Boulevard, not by Toronto Building. Applications go in online through Markham's ePLAN portal, and the City's building permit process page sets out the basics:
- A $100 non-refundable pre-application fee has to be paid before drawings can be uploaded.
- Projects that need a permit include "renovating a dwelling to provide a full basement", "installing a basement entrance" and "installing an accessory apartment". Interior damp-proofing does not.
- Target first-review times are 10 business days for a complete application on a house or other small project and 20 for an incomplete one, and 15 and 20 days for an accessory apartment. The City says getting a permit can take 10 to 40 days overall, and it will not process an incomplete application.
The page does not name underpinning as a line in its permit list, but the fee schedule (below) carries a separate underpinning fee, which tells you how the City treats it. If you are unsure whether your scope needs a permit, Markham asks you to call Building Standards at 905.475.4858 before you start.
Most delays on underpinning permits anywhere come from incomplete drawings. Markham's own targets double from 10 to 20 days when the package is incomplete, so the drawing set is the part to get right.
What the permit costs in Markham in 2026
Markham sets building permit fees in a by-law each year. The City's fee schedule page summarizes Schedule A of By-law 2025-121, which applies to applications submitted after December 31, 2025. The lines that matter for a basement job:
| Fee line (2026) | Amount |
|---|---|
| Underpinning | $18.83, listed as "Underpinning (/m of length)" |
| Below grade stair | $498 each |
| Exterior door, or door from garage into dwelling | $498 each |
| Secondary suite (alteration) | $22.08 per square metre |
| All other residential alterations | $8.43 per square metre |
| Minimum fee, residential construction | $151 |
| Pre-application review | $100 |
One honest caveat about the underpinning line: the schedule describes it as per metre of length, but its unit column reads "per square metre". We have worked the example below per metre of wall length, which is how the line is described. Confirm the basis with Building Standards when you apply.
For comparison, Toronto charges $12.37 per linear metre of underpinning in 2026, with a $214.79 minimum. The two cities measure the same thing and charge different amounts, which is why a Toronto permit estimate is the wrong number for a Markham address.
Who draws it, and where the engineer comes in
Markham's guide to building permits lists what goes in a housing application, including structural drawings with the footing and foundation design, and a site plan showing finished first floor and basement elevations. Its secondary suite guide says the drawings can be prepared by a BCIN-qualified designer, a licensed architect, a Professional Engineer, or a homeowner willing to take responsibility for the Building Code.
Underpinning is the part of that list that is plainly engineering. New footings are being poured beneath the old ones, section by section, under a house that stays standing. The same Markham permit guide shows how the City thinks about digging near a lot line on infill projects: it asks for a temporary shoring plan where new foundation walls are 1.8 m or less from an adjacent property line, or excavation is within 1.2 m of one, and for a description of the structural design and a Commitment to General Review where work goes below the footings of an adjacent building. Those rules sit under demolition and infill permits rather than underpinning, but the concern is identical: the neighbour's footing.
Our working assumption on every Markham job is an engineer from day one, for the design and for site reviews during the dig. Our page on the underpinning engineer in Toronto explains what the drawings show and what the engineering line costs; the engineering itself is the same across the line between the two cities.
We coordinate underpinning projects, the engineer and the permit. We do not perform structural engineering, and nobody can tell you how deep your basement can go, or whether a crack matters, until an engineer has looked at it.
The suite rules that decide whether lowering pays
Most people who underpin are buying height for a reason, and in Markham the reason is usually a basement apartment. Markham calls these secondary suites, additional residential units or accessory dwelling units depending on the document. The City's Secondary Suites Guide for Homeowners (April 2026, built on the 2024 Ontario Building Code and Zoning By-law 2024-19) sets out the rules, and several of them are different from Toronto's.
Ceiling height. The guide lists the Part 9 minimums for a secondary suite:
| Location | Minimum height |
|---|---|
| General areas within the suite | 1.95 m (about 6 ft 5 in) |
| Under beams and ducting | 1.85 m (about 6 ft 1 in) |
| Common areas | 2.10 m (about 6 ft 11 in) |
Height is where older basements fail, and it is the only one of these rules that money spent on finishing cannot fix. That is what underpinning or basement lowering is for.
Parking. This is the biggest practical difference from Toronto. Markham's guide says a house with a secondary suite needs one parking space for the main dwelling and one for the suite, each at least 2.75 m wide and 5.8 m long, and street parking does not count. Toronto stopped requiring parking for houses of two to four units in 2022. Before you spend on a lowering in Markham, check that your driveway can hold two cars to that size.
The entrance. Only one dwelling unit entrance may face the street on a main wall, unless the second entrance is below grade. A suite entrance in the interior side yard has to be at least 1.2 m from the side lot line, and the stairs to it cannot sit within 1.2 m of that line either. On a narrow side yard, that rule can decide whether a side walkout is possible at all, before anyone looks at the soil. Our guide to the basement walkout in Toronto covers the structure of a walkout; in Markham, run the side yard measurement first.
Egress windows. Every floor with a bedroom needs a window that opens from inside without tools, with at least 0.35 m² of clear opening and no dimension under 380 mm. For a basement, Markham recommends a sill no more than 1,500 mm above the floor, and a window well needs 550 mm of clearance in front of the window. Enlarging a window is easiest while the foundation is already being worked on.
Registration. A Markham suite is not finished when the inspector signs off. The City requires every secondary suite to be registered with Markham Fire and Emergency Services, and the Ontario Building Code limits a house to two dwelling units in total.
The age of your house changes which rules apply
Markham's guide draws a line at five years. A house less than five years old has to follow Part 9 of the Building Code; a house more than five years old may use the more flexible Part 11 rules for existing buildings. In practice that changes the fire separation (15.9 mm Type X gypsum on a newer house, against a 30-minute separation on an older one, or 15 minutes for a floor separation where the smoke alarms are interconnected), the sound rating between units, and whether the existing furnace can serve both units.
None of that is underpinning, but it changes the total cost of the suite project the underpinning is meant to unlock. Ask your designer which Part applies before you settle the budget.
Heritage districts: Thornhill, Markham Village, Unionville and Buttonville
Markham protects four areas as heritage conservation districts under Part V of the Ontario Heritage Act: Thornhill, Markham Village, Buttonville and Unionville. The City's heritage districts page says exterior alterations, new construction and demolition in a district need a Minor or Major Heritage Permit, and that each district has its own plan and guidelines.
Underpinning from inside is mostly invisible from the street. A walkout cut into a side or rear yard, an enlarged basement window or a new below-grade entrance is an exterior change, and in a heritage district we would plan for heritage review alongside the building permit rather than discover it afterwards. Check your district plan, or ask the City's heritage staff, before the drawings are finished.
Ravines, the Rouge and flood-prone lots
All of Markham sits inside the Toronto and Region Conservation Authority's jurisdiction, according to TRCA's list of participating municipalities, and the Rouge River watershed runs through it. Lots next to a valley, a creek or a regulated floodplain can need a TRCA permit before any excavation begins. A walkout on a sloping valley lot is the case where this comes up most often.
Markham's suite guide adds one drainage rule: if your property is in a flood-prone zone, each dwelling unit needs a backwater valve, with details in the City's Builder Tip No. 108. Lowering a basement floor makes it the lowest point on the property by a wider margin, so the drainage design deserves the same attention as the footings. Exterior waterproofing during the dig runs $3,000 to $12,000 on our published range; our basement waterproofing guide explains what that buys. Toronto's flooding subsidy does not apply to a Markham address.
What basement underpinning costs in Markham
The per-foot range is not set by the municipality. What changes in Markham is the permit line, and what you need around the job, like a second parking space or a heritage permit.
Worked example: a detached house with 130 feet of perimeter
| Line item | Low | High | How it is worked out |
|---|---|---|---|
| Underpinning | $65,000 | $97,500 | 130 ft at $500 to $750 per linear foot |
| Markham underpinning permit fee | about $746 | about $746 | 130 ft is 39.6 m; 39.6 x $18.83 (2026 schedule, read per metre of length) |
| Pre-application fee | $100 | $100 | Paid before drawings upload |
| Structural engineering | $1,500 | $8,000 | Simple design to an adjacent-footing design with site reviews |
| Before HST | about $67,346 | about $106,346 |
Then add what applies to your house: a basement walkout in Markham at $15,000 to $30,000 on top (plus $498 for the below-grade stair on Markham's schedule), exterior waterproofing at $3,000 to $12,000, the suite permit at $22.08 per square metre of suite if you are building one, and the finishing, which is a separate project. A semi with 100 feet of wall works out to about $52,174 to $83,674 before HST (30.5 m of wall, so about $574 in permit fee) on the same basis. These are ranges built from published figures, not a quote; the drawings set the real number.
Toward the lower end: a simple rectangular footprint, a driveway for the soil bin, a modest lowering, no neighbouring footing within reach and an empty house during the work.
Toward the higher end: a deep lowering, a close neighbour on a narrow lot, wet or unknown soil near a valley, spoil carried out by hand and old footings that surprise the crew once opened.
The full breakdown of each line, and what other contractors publish, is on our page on underpinning cost in Toronto. If you are deciding between underpinning and a cheaper perimeter bench, our benching vs underpinning guide works through the trade.
A sensible order of operations for a Markham basement
- Look up your zoning. Markham's Property Details Search tool gives the zone, the by-law and whether By-law 2024-19 applies to you.
- Measure the two things that can end the plan early: the driveway, for two spaces at 2.75 m by 5.8 m, and the side yard, if the suite entrance would go there.
- Check for a heritage district or a valley lot. Either one adds an approval to the timeline.
- Measure the basement height to the underside of the lowest beam and duct, and compare it with 1.95 m and 1.85 m.
- Bring in the engineer and the designer before anyone quotes a firm number for the dig.
- Apply through ePLAN with a complete package, and plan for the dig itself to take several weeks.
Our page on underpinning permits in Toronto covers how the drawing package is built; the engineering content is the same, but the Markham application goes to Markham.
Common questions
How much does basement underpinning cost in Markham?
$500 to $750 per linear foot of foundation wall on our published range, the same rate as Toronto. For a house with 130 feet of perimeter that is $65,000 to $97,500 for the underpinning, or about $67,346 to $106,346 with engineering and Markham's permit and pre-application fees, before HST.
Who issues the permit for underpinning in Markham?
The City of Markham Building Standards Department, through its ePLAN portal. Toronto Building has nothing to do with a Markham address, and Markham's fees and review times are its own.
What is Markham's permit fee for underpinning?
Markham's 2026 fee schedule (By-law 2025-121) lists underpinning at $18.83, described as per metre of length, with a $151 residential minimum and a $100 pre-application fee. The schedule's unit column reads per square metre, so confirm the basis with Building Standards when you apply.
What ceiling height does a basement apartment need in Markham?
Markham's Secondary Suites Guide lists 1.95 m in general areas of the suite, 1.85 m under beams and ducting, and 2.10 m in common areas. If your basement falls short, underpinning or benching is how you gain the height.
Does a Markham basement suite need parking?
Yes. Markham's guide requires one parking space for the main dwelling and one for the secondary suite, each at least 2.75 m by 5.8 m, and street parking does not count. Check the driveway before you pay for a lowering.
Do I need a heritage permit to underpin in Unionville or Thornhill?
Work inside the house is mostly a building permit matter, but exterior alterations in Markham's four heritage districts (Thornhill, Markham Village, Unionville and Buttonville) need a Minor or Major Heritage Permit. A walkout or a larger window is exterior work, so ask the City's heritage staff early.
Does Toronto's basement flooding subsidy apply in Markham?
No. That program is run by the City of Toronto for Toronto properties. Markham's own suite guide requires a backwater valve for each dwelling unit on a flood-prone property.
Call (289) 207-6470 with your Markham address and the rough size of your basement, or send the details below, and we will tell you what an underpinning job like yours is likely to involve and which approvals to line up first.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.