The Canada Secondary Suite Loan Program is not available, and it never was. It was announced as an $80,000 loan at 2 per cent over 15 years, never opened, and Budget 2025 confirmed it will not be implemented. The federal tool that does exist is CMHC Refinance: an insured refinance of up to 90 per cent of your home's as-improved value, under $2 million, to build a suite.
If you are planning a basement apartment in Toronto, that changes the math. This guide sets out what was promised, what was cancelled and why, how the refinance that replaced it actually works, and what it can and cannot pay for when the suite needs basement lowering in Toronto before it can pass code. Every federal figure below comes from the Government of Canada's own documents, linked where it is used. Nothing here is lending advice; your lender or mortgage broker decides what you qualify for.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.
What was promised, and when
The program was a Budget 2024 idea that grew. On December 10, 2024, the Department of Finance announced in the 2024 Fall Economic Statement that it would double the loan limit from $40,000 to $80,000, offer 15-year terms at 2 per cent, and launch in early 2025, with CMHC administering it. The release named the exact project this site exists for: converting an unused basement into a rental apartment.
The same release announced a second measure: starting January 15, 2025, lenders and insurers would allow mortgage refinancing of up to 90 per cent of the post-renovation value, up to $2 million, amortized over up to 30 years, and homeowners would be able to use both the loan and the refinance on the same suite.
That pairing is why so many Toronto homeowners still search for the loan. A cheap $80,000 fixed at 2 per cent would have covered a meaningful share of a basement suite. Lenders, brokers and contractors wrote about it as a done deal, and many of those pages are still online.
What happened to it
It never opened. Budget 2025, tabled November 4, 2025, says so in its Comprehensive Expenditure Review chapter: to meet savings targets, CMHC will wind down certain programs, and the Canada Secondary Suite Loan program, "which is not yet operational, will not be implemented" because it overlapped with the homeowner insured mortgage rule changes announced in January 2025.
In plain terms, Ottawa decided the refinance already does the job, so the loan was dropped before a single application was taken.
If a contractor, lender or website tells you in 2026 that you can still apply for the $80,000 secondary suite loan, treat everything else they say about financing with caution. The federal government has said in writing that the program will not be implemented.
The tool that does exist: CMHC Refinance
The surviving measure is an insured refinance product CMHC calls CMHC Refinance. Its factsheet says it helps homeowners add a secondary suite, "such as a basement suite, an in-law apartment or a laneway home". The terms that matter for a Toronto basement project:
| Term | What the factsheet says |
|---|---|
| Loan-to-value | Up to 90 per cent, owner-occupied, up to 4 units including the existing one(s) |
| Value ceiling | The lending value or as-improved property value must be below $2,000,000 |
| Amortization | Up to 30 years |
| Credit | At least one borrower or guarantor with a credit score of 600 or more |
| Debt service | Maximum GDS 39 per cent, TDS 44 per cent |
| Qualifying rate | The greater of your contract rate plus 2 per cent, or 5.25 per cent |
| The suite | Self-contained, compliant with applicable bylaws and regulations |
| Rentals | Not a short-term rental: never rented for any period under 90 consecutive days |
| Advances | Progress advances: CMHC validation of up to 4 consecutive advances at no cost, or lender validation without CMHC preapproval |
You do not apply to CMHC directly. The product is insured mortgage financing, so it goes through your lender or broker, and CMHC's own factsheet warns that conditions can change and to verify the current terms before the loan is processed. CMHC lists 1-888-463-6454 for questions.
Why "as-improved value" is the whole game
The refinance is sized on what your house will be worth after the suite is built, not what it is worth today. That is the feature that makes it useful for a basement suite, and it is also the part that needs the most preparation.
An as-improved value can only be estimated from a defined scope. A lender cannot value "we might lower the basement"; it can value a set of drawings and a written scope. For a basement that needs lowering, that means the structural decisions come before the money conversation, not after it:
- Is the suite legal at all? In Toronto the legal basement apartment rules allow one secondary suite in a detached house, semi or townhouse, capped at 45 per cent of the dwelling's interior floor area, except in the basement of a one-storey detached house, where the suite may take the whole basement.
- Does the basement reach height? Most pre-1960s Toronto basements start at 6 feet to 6 feet 8 inches, and a suite needs more than that at the finished ceiling. If it does not reach, the suite needs lowering, and the lowering is the biggest number in the budget.
- Who designs it? The City requires a Professional Engineer's sealed design and field review on most semis, clay lots and deep lowerings, and an engineer's testing at the first and last stages of every underpinning job. We coordinate that work; the design and the seal come from a licensed Ontario engineer, never from us. The underpinning engineer in Toronto page explains when the City requires a P.Eng and what the drawings cover.
The refinance pays for a suite that a lender can see on paper. The engineer's drawings are what put it on paper.
The $2 million ceiling in a Toronto context
The as-improved value has to come in below $2,000,000. In many central Toronto neighbourhoods a detached house is already near or above that before any work starts, and adding a legal suite raises the value further, so those homes can fall outside the product altogether.
The ceiling bites less on the housing stock that most often needs underpinning for a suite: east-end semis, row houses and the post-war bungalow belts in Scarborough and North York, where the one-storey whole-basement rule also makes the suite larger. Whether your house fits is a question for an appraiser, not for us, but it is worth asking on the first call rather than after the drawings are paid for.
What the refinance has to cover: a worked Toronto example
Here is the structural side of a typical semi-detached suite on this site's published ranges. It is an illustration, not a quote; your house will be priced on its own conditions after an engineer has seen it.
| Line | Range | Source |
|---|---|---|
| Underpinning, 100 ft of wall at $500 to $750 per linear foot | $50,000 to $75,000 | Our underpinning cost in Toronto page |
| City underpinning permit, $12.37 per linear metre (30.5 m) | about $377 | City fee schedule, effective January 1, 2026 |
| Engineering | $1,500 to $8,000 | Published range |
| Structural subtotal before HST | $51,900 to $83,400 | |
| Secondary suite permit, $11.53 per m2 plus $56.33 per new unit, for a 60 m2 suite | about $748 | City fee schedule |
| Enlarged egress window, if needed | $3,000 to $7,000 | Published range |
The suite fit-out (framing, fire separation, kitchen, bathroom, finishes) sits on top of that and is a separate trade; we do not price finishing. Add exterior waterproofing during the dig at $3,000 to $12,000 if the walls are open anyway, which is the cheapest moment it will ever be done.
Two things follow from that table. First, the structural work alone can exceed the $80,000 the cancelled loan would have offered, so even when it was promised, the loan was never going to pay for a lowered-basement suite on its own. Second, a refinance sized on as-improved value can, in principle, cover the whole stack, provided your income clears the debt-service tests.
The real constraint is usually income, not equity
A 90 per cent loan-to-value limit sounds generous, and for many Toronto owners with years of equity it is. The test that more often decides the amount is debt service: total housing costs within 39 per cent of gross income and all debts within 44 per cent, calculated at the greater of your contract rate plus 2 per cent or 5.25 per cent.
The arithmetic of the stress test is simple. If your lender offers 4.5 per cent, you qualify at 6.5 per cent. If it offers 3 per cent, you qualify at 5.25 per cent, because the floor is higher than 3 plus 2. Every extra dollar borrowed is tested at that higher rate over the amortization you choose, up to 30 years.
Ask your lender directly whether and how the suite's projected rent is counted toward qualifying, because it changes the answer, and lenders apply their own guidelines inside CMHC's limits. Insured mortgages also carry a mortgage insurance premium; ask for the figure in dollars, because on a large refinance it is not small.
Progress advances and an underpinning schedule
An underpinning job is not paid in one lump. The work runs in alternating sections over four to six weeks on site, after the City permit review (a median of 13 days for 2025 applications), with staged City inspections along the way. CMHC Refinance allows progress advances, and under the full-service option CMHC validates up to 4 consecutive advances at no cost.
That lines up reasonably well with how structural work is staged: a deposit after the permit, then advances tied to the first sections, the last sections, and the new slab. Agree the advance points with your lender before you sign the construction contract, so the contractor's payment schedule and the lender's release schedule match. A mismatch there is how homeowners end up bridging a contractor invoice on a credit card. The underpinning process and timeline page sets out the stages week by week.
The order to do things in
- Measure the basement properly to the lowest obstruction, not the joists, and decide whether a suite needs lowering at all.
- Confirm the suite is permitted under the zoning rules for your house type.
- Get engineering and a written scope, so there is something concrete to value.
- Talk to your lender or broker about CMHC Refinance with that scope in hand: as-improved value, the $2 million ceiling, debt service, the premium, and advance points.
- Apply for permits: the underpinning permits in Toronto page lists the drawings and the fee, and the suite permit is a separate application.
- Sign the construction contract with a payment schedule that matches the lender's advances.
Financing approval before construction matters. Starting the dig on savings and hoping to refinance afterward is a different, and riskier, transaction.
Is a suite still worth it without the cheap loan?
For some houses, yes; for some, no. The cancelled loan would have made the decision easier at the margin, but the core arithmetic never depended on it: rent from a legal suite against the full cost of making the basement legal. The is underpinning worth it page runs that against adding on and against moving, and the Toronto basement apartment rules for 2026 explain what actually governs the suite.
Common questions
Is the Canada Secondary Suite Loan Program still available?
No. It was announced in the 2024 Fall Economic Statement as a loan of up to $80,000 at 2 per cent over 15 years, but it never opened, and Budget 2025 (November 4, 2025) states that it will not be implemented because it overlapped with the insured mortgage rule changes from January 2025.
What replaced the secondary suite loan?
CMHC Refinance, an insured refinance for owner-occupied homes adding a suite. It allows up to 90 per cent of the as-improved value, which must be below $2,000,000, amortized over up to 30 years, for up to 4 units including the existing one.
Can I use CMHC Refinance to pay for underpinning a basement suite in Toronto?
The product is for creating a secondary suite, and lowering the basement is often what makes a Toronto suite legal, so the structural work is part of the suite cost. Your lender decides what it will finance, so take the engineer's scope to them before you sign a construction contract.
How much can I borrow to build a basement apartment?
Up to 90 per cent of the home's value after the suite is built, minus what you already owe, and only if your income passes the debt-service tests: GDS 39 per cent and TDS 44 per cent, calculated at the greater of your contract rate plus 2 per cent or 5.25 per cent.
What does a lowered basement suite cost in Toronto?
On this site's published ranges, the structural side for a semi with 100 feet of wall runs about $51,900 to $83,400 before HST, covering underpinning at $500 to $750 per linear foot, the City permit and engineering. The suite permit, any egress window and the fit-out are on top.
Can I rent the suite on Airbnb if I use CMHC Refinance?
No. CMHC's terms say the suite must not be used as a short-term rental, meaning it cannot be rented for any period of less than 90 consecutive days.
Do I apply to CMHC directly?
No. CMHC Refinance is insured mortgage financing arranged through your lender or mortgage broker. CMHC's factsheet says terms can change and should be verified before the loan is processed.
Call (289) 207-6470 with your address and what you want the basement to become, or send the details below, and we will tell you what a lowering like yours is likely to involve and who you need on it, so you have a real scope to take to your lender.
Rather just talk?
(289) 207-6470Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.
- A firm, itemized price up front
- Permits and engineering in the number
- The real timeline, honestly
Get a real range
Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.