Home / Basement Underpinning in Pickering

Basement Underpinning in Pickering

Reviewed November 2026 · Toronto & the GTA

Typical cost$500 – $750per linear foot, same rate as Toronto
ResultsPickering permit, no published day countrush available
Best forPickering houses being lowered for a registered additional dwelling unit

Basement underpinning in Pickering costs $500 to $750 per linear foot of foundation wall on our published range, about $65,000 to $97,500 for a house with 130 feet of perimeter, before engineering, the permit and HST. The City of Pickering names "basement underpinning" on its list of work that needs a building permit, takes applications online only, and requires a Professional Engineer for any new basement entrance. If the lowering is for a basement apartment, Pickering also makes you register it.

Pickering is its own municipality in Durham Region, with its own Building Services, its own fee schedule and its own rules for additional dwelling units, so a Toronto permit fee, a Toronto subsidy or Toronto permit timing does not carry over. The digging itself, the alternating sections, the engineer's role and the sequence of a job, is covered in our guide to basement underpinning in Toronto. This page is about the Pickering layer: what the City's own permit list says, what its July 2026 fee schedule does and does not tell you, the registration rule that comes with a basement suite, and the places where a dig needs more than a building permit.

Rather just talk?

(289) 207-6470

Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.

  • A firm, itemized price up front
  • Permits and engineering in the number
  • The real timeline, honestly
Call now

Get a real range

Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.

No obligation. Your details go only to our Toronto team.

What the City of Pickering's permit list says

Pickering's building permits page is unusually direct. Its list of work that needs a permit includes, in the City's own words:

  • "Basement underpinning"
  • "Excavating and/or constructing foundations"
  • "Finishing a basement"
  • "Constructing a basement entrance (P. Eng. Required)"
  • "Adding a second suite"

The City says the list is not exhaustive. On the other side of the line, it lists basement waterproofing repairs and sump pumps among work that typically does not need a permit, and it notes that zoning compliance can still apply where no permit is needed. A lowering is not a waterproofing repair: once the footings are being extended, it is underpinning, and it is on the permit list.

How the application works:

  • Online only. Residential permits go through Pickering's Online Application Portal at mycity.pickering.ca. The City says paper copies are no longer accepted at the counter, and digital drawings sent by email will not be accepted or reviewed.
  • The 2024 Ontario Building Code applies. Pickering reviews applications received on or after January 1, 2025 under the 2024 Code, and the 2024 Code became required for all new permit applications from April 1, 2025.
  • Fees are billed in two steps. An initial minimum fee is charged at submission and the full fee is assessed after review. Online credit card payments carry a 2.65 percent convenience fee.
  • No published review clock. The City's page gives no number of days. It says permits are issued promptly for complete submissions that meet the requirements, and that the Building Clerk can estimate the timeline once you have applied.
The point

Do not budget a Pickering job on Toronto's permit numbers. Pickering publishes no day count, so the honest plan is a complete package and a call to Building Services once it is in.

Building Services is at the Pickering Civic Complex, One The Esplanade, and can be reached at 905.420.4631.

What goes in the drawing package

Pickering's online permit application submission requirements set out the documents the portal expects. For the structural side of a basement job, the structural drawings are to show the footing and foundation materials and sizes, label all materials and members, carry supporting structural calculations as required and be stamped and signed by a Professional Engineer in Ontario. The same document lists a Commitment to General Review, completed where an architect or engineer has to be the designer and carry out site reviews, and a Schedule 1 designer information form for each discipline.

Two lines in that document matter for basement work in particular:

  • For walk-up or new basement stairs and entrances, the City asks for professional structural engineered stamped drawings and a general review commitment form with the submission.
  • For a property on a private septic system, a Schedule 2 sewage system designer form is required where it applies.

Underpinning is plainly engineering. New footings are poured beneath the old ones, section by section, under a house that stays standing. Our working assumption on every Pickering job is an engineer from day one, for the design and for site reviews during the dig. Our page on the underpinning engineer in Toronto explains what those drawings show and what the engineering line costs; the engineering is the same on either side of the city line, even though the application goes to Pickering.

We coordinate underpinning projects, the engineer and the permit. We do not perform structural engineering, and nobody can tell you how deep your basement can go, or whether a crack matters, until an engineer has looked at it.

What the permit costs: Pickering's July 2026 fee schedule

Pickering sets its building permit fees under Building By-law 8057/23, and the current figures are in the City's Schedule of Application Fees and Information Price List, dated July 1, 2026. The City's permits page says fees increased for applications submitted after June 30, 2026. The lines that matter for a basement job:

Fee line (July 1, 2026) Amount
Minimum building permit fee $180
Interior partitioning and finishing (including apartments in houses and finished basements) $7.37 per square metre of gross floor area
Minor residential structures, including a basement walkout $180 each
Alterations not provided for elsewhere in the schedule $17.10 per $1,000 of construction value
Performance deposit (secondary suites, finished basements and basement walk ups, among others) $1,000
Records management fee (houses and minor residential alterations) $13.35
Revision to a permit (houses) $180
Resubmission of an incomplete application 25 percent of the application fee

Unlike Toronto, which lists underpinning at $12.37 per linear metre, and Markham, which has its own underpinning line, Pickering's schedule has no separate underpinning line. Which line Building Services applies to your underpinning is the City's call. The worked example below assumes the "alterations not provided for" line on the value of the underpinning, which is our reading, not the City's ruling. Confirm it with Building Services when you apply.

One line to avoid entirely: the schedule includes a building permit surcharge for residential work that starts before a permit is issued, and for Part 9 houses it is 50 percent of the fee once footings or foundations have commenced. Underpinning is footing work by definition, so there is no version of "start digging and apply later" that makes sense here.

The basement apartment rules: two units, and registration

Most people who underpin are buying height for a reason, and in Pickering that reason is usually an additional dwelling unit. The City's additional dwelling units page sets out the framework Council approved in 2023:

  • Up to two ADUs are permitted on most residential properties with a detached, semi-detached, block townhouse or street townhouse dwelling.
  • The two can be arranged as one or two units in the main house, one unit in a separate building in the back or side yard, or one in the house plus one in a separate building. Pickering notes that two ADUs in the main residence make it a "Small Building" under the Ontario Building Code, which brings a different set of Code requirements.
  • The City regulates maximum floor area, maximum height, minimum distance from property lines and required parking, to a maximum of one space.
  • Every ADU has to comply with the Ontario Building Code.

Registration is mandatory. Under Municipal By-law 8040/23, every ADU in Pickering, including a basement apartment, has to be registered with both Building Services and Fire Services. Registration happens only after the final construction has been inspected by Pickering's fire and building inspectors and any outstanding fees are paid, and the City then emails a registration certificate. There is a one-time registration fee, payable at application; the page does not state the amount, so ask Building Services. ADU questions go to City Development at 905.420.4617.

What the City's page does not do is restate the Building Code's ceiling heights, egress or fire separation for a basement unit. Those come from the Code itself. Height is the one requirement that money spent on finishing cannot fix, and it is the reason underpinning or basement lowering is on the table at all; our guide to the legal basement apartment covers how ceiling height decides a second suite, and our page on basement window enlargement covers the egress window a basement bedroom needs. Have your designer confirm the current Code figures for your Pickering project before the lowering depth is fixed.

Pickering and the Town of Whitby have also pre-approved five detached ADU designs for back and side yards. The City says a building permit is still required for those to confirm zoning compliance. They are not basement plans, but if you are weighing a garden suite against a lowered basement, they are worth a look.

A walkout or a new basement entrance in Pickering

A walkout is where Pickering's rules are firmest. "Constructing a basement entrance" carries the note "P. Eng. Required" on the City's permit list, and the submission requirements ask for stamped structural drawings and a general review commitment form for any walk-up or new basement stair. The fee schedule prices a basement walkout as a minor residential structure at $180 each.

The cost of the walkout itself is the construction, not the fee. Adding one typically runs $15,000 to $30,000 on top of the underpinning on our published range, depending on grade, soil and drainage. Our guide to the basement walkout in Toronto covers the structure of a walkout: the lintel, the stairwell walls, the drain at the bottom. In Pickering, check the zoning for your lot and the entrance's distance from the lot lines before anyone draws it.

Whitevale and other heritage properties

Pickering has one heritage conservation district. Council designated the entire Hamlet of Whitevale as a Heritage Conservation District under Part V of the Ontario Heritage Act (By-law 4074/92), and the City's heritage planning page says a Heritage Permit is required for new construction, changes, additions or demolition to a property in that district. Individually designated properties under Part IV need a permit for alterations, additions or demolition, and listed properties need Council approval before demolition.

Underpinning from inside is mostly invisible from the street. A walkout cut into a side or rear yard, an enlarged basement window or a new below-grade entrance is an exterior change. In Whitevale, or on a designated property anywhere in the city, plan for the heritage review alongside the building permit, and talk to the City's heritage planner (905.420.4617) before the drawings are finished.

Creeks, the lakeshore and conservation authority permits

Pickering's submission requirements list the TRCA (Toronto and Region Conservation Authority) and CLOCA (Central Lake Ontario Conservation Authority) among the other agencies whose approval can be applicable law for a building permit. Durham Region is one of TRCA's participating municipalities, and TRCA's jurisdiction includes the Duffins Creek, Petticoat Creek, Carruthers Creek and Rouge River watersheds. Pickering's own flood page says TRCA issues riverine and shoreline flood messages for Pickering, and lists TRCA's 24-hour floodline at 416.661.6514.

What that means for a basement: a lot near a valley, a creek or the shoreline can sit in a regulated area, and excavation there can need a conservation authority permit before the City will issue its own. A walkout on a sloping lot is where this comes up most. Our guide to the TRCA permit explains the regulation, what counts as development activity and how the review works; it is written for Toronto lots, but O. Reg. 41/24 is provincial, and the steps are the same in Pickering's part of TRCA's area.

Lowering a basement floor makes it the lowest point on the property by a wider margin, so drainage deserves the same attention as the footings. Exterior waterproofing during the dig runs $3,000 to $12,000 on our published range; our basement waterproofing guide explains what that buys. Toronto's basement flooding protection subsidy is a City of Toronto program and does not apply to a Pickering address.

What basement underpinning costs in Pickering

The per-foot range is not set by the municipality. What changes in Pickering is the permit line, the registration step and anything your lot adds, such as a conservation authority or heritage permit.

Worked example: a detached house with 130 feet of perimeter

Line item Low High How it is worked out
Underpinning $65,000 $97,500 130 ft at $500 to $750 per linear foot
Pickering permit fee about $1,112 about $1,667 $17.10 per $1,000 of construction value on the underpinning, our reading of the schedule (confirm with the City)
Records management fee $13.35 $13.35 July 2026 schedule
Structural engineering $1,500 $8,000 Simple design to an adjacent-footing design with site reviews
Before HST about $67,625 about $107,181

Then add what applies to your house: a walkout at $15,000 to $30,000 plus the $180 walkout permit line, exterior waterproofing at $3,000 to $12,000, the finishing permit at $7.37 per square metre if you are building a suite, the $1,000 performance deposit listed for secondary suites, finished basements and basement walk ups, the ADU registration fee, and the finishing itself, which is a separate project. These are ranges built from published figures, not a quote; the drawings set the real number.

Toward the lower end: a simple rectangular footprint, a driveway for the soil bin, a modest lowering, no neighbouring footing within reach and an empty house during the work.

Toward the higher end: a deep lowering, a close neighbour on a semi or a narrow lot, wet or unknown soil near a creek, spoil carried out by hand and old footings that surprise the crew once opened.

The full breakdown of each line is on our page on underpinning cost in Toronto. If you are deciding between underpinning and a cheaper perimeter bench, our benching vs underpinning guide works through the trade, and our page on helical piles vs underpinning explains why piles, which come up on additions, do not add basement height.

A sensible order of operations for a Pickering basement

  1. Check the zoning and the ADU rules for your lot, including the parking space, before you pay for a lowering. City Development (905.420.4617) handles ADU questions.
  2. Check for a heritage designation or a regulated area. Whitevale, a designated property or a lot near a creek or the shoreline adds an approval to the timeline.
  3. Measure the basement height to the underside of the lowest beam and duct, and have your designer compare it with the Code's requirements for the unit you want.
  4. Bring in the engineer and the designer before anyone quotes a firm number for the dig. If there will be a new basement entrance, the engineer is required anyway.
  5. Apply through the online portal with a complete package, and pay the minimum fee at submission. Incomplete applications cost 25 percent of the fee again to resubmit.
  6. Book inspections as the work proceeds, and register the unit with Building and Fire Services once the final inspection is passed.

Our page on underpinning permits in Toronto covers how the drawing package is built; the engineering content is the same, but the Pickering application goes to Pickering.

Common questions

How much does basement underpinning cost in Pickering?

$500 to $750 per linear foot of foundation wall on our published range, the same rate as Toronto. For a house with 130 feet of perimeter that is $65,000 to $97,500 for the underpinning, or about $67,625 to $107,181 with engineering and Pickering's permit and records fees on our reading of the schedule, before HST.

Does Pickering require a permit for basement underpinning?

Yes. The City of Pickering lists "basement underpinning" by name on its list of work that needs a building permit, along with excavating or constructing foundations, finishing a basement and adding a second suite. Applications go through the City's online portal only.

What does a Pickering building permit cost for underpinning?

Pickering's July 1, 2026 fee schedule has no separate underpinning line, unlike Toronto's $12.37 per linear metre. The minimum permit fee is $180, and work not provided for elsewhere is charged at $17.10 per $1,000 of construction value. Which line applies to your underpinning is for Building Services to confirm when you apply.

How many basement apartments can I add in Pickering?

Pickering permits up to two additional dwelling units on most properties with a detached, semi-detached, block townhouse or street townhouse dwelling, in the main house, in a separate building in the yard, or one of each. Required parking is capped at one space.

Do I have to register a basement apartment in Pickering?

Yes. Municipal By-law 8040/23 makes registration mandatory for every additional dwelling unit, including basement apartments. The unit is registered with Building Services and Fire Services after the final inspection, and there is a one-time registration fee.

Does a basement walkout in Pickering need an engineer?

Yes. The City's permit list says "constructing a basement entrance" requires a Professional Engineer, and its submission requirements ask for stamped structural drawings and a general review commitment form for any walk-up or new basement stair. The walkout permit line on the 2026 schedule is $180.

Does Toronto's basement flooding subsidy apply in Pickering?

No. That program is run by the City of Toronto for Toronto properties. On a Pickering lot near a creek or the shoreline, check whether a TRCA or CLOCA permit applies before the excavation is designed.

Call (289) 207-6470 with your Pickering address and the rough size of your basement, or send the details below, and we will tell you what an underpinning job like yours is likely to involve and which approvals to line up first.

Rather just talk?

(289) 207-6470

Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.

  • A firm, itemized price up front
  • Permits and engineering in the number
  • The real timeline, honestly
Call now

Get a real range

Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.

No obligation. Your details go only to our Toronto team.

Know the number before you dig.

Tell us your perimeter and current height. We will give you a realistic range, not a brochure.

Call (289) 207-6470
Call nowGet a range