Reviewed October 2026 · Toronto & the GTA

Typical cost$500 – $750per linear foot of wall, when the basement unit needs underpinning for height
ResultsZoning check and engineer firstrush available
Best forOwners converting a house to a triplex or fourplex with a unit below grade

A multiplex in Toronto is a house with two to four homes in one building, and four units are allowed on residential lots across the whole city. Six are allowed in some areas. Zoning rarely stops a conversion now. The basement unit usually does, because an older Toronto basement is too low for a home, and the only way to gain that height is to go down.

The City changed the rules in 2023 and again in 2025. What did not change is the house you already own: a 1920s semi in Riverdale or a 1950s bungalow in Scarborough has the same basement it had before the by-law passed. Many multiplex plans that start as "add three units to the house" turn, within one meeting with a designer, into "first, what do we do about the basement". If you only want a single basement apartment, the rules are simpler and are covered on our page on the legal basement apartment in Toronto. This page is about the multiplex route.

Rather just talk?

(289) 207-6470

Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.

  • A firm, itemized price up front
  • Permits and engineering in the number
  • The real timeline, honestly
Call now

Get a real range

Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.

No obligation. Your details go only to our Toronto team.

What the City actually permits

The City defines a multiplex as a house with 2 to 6 homes (dwelling units) in one residential building. The current permissions, from the City's Multiplex Housing page and its considerations for building multiplexes:

Rule What the City says Why it matters below grade
Units allowed Four units permitted citywide; six-unit permissions vary by location A fourplex on a typical lot almost always means one unit in the basement
Where six are allowed Toronto and East York District and Ward 23, under amendments Council adopted June 25 to 26, 2025 More units in the same footprint makes the basement unit harder to leave out
Zones R, RD, RS, RM and RT zones; an existing house may be converted to two, three or four units Conversion of an existing house is the usual case, so the existing foundation is the starting point
Stacking Units must be stacked, with at least one entirely or partially above another Side by side is treated as a townhouse or semi, not a multiplex
Height Limited in metres, not storeys; where the Height Overlay shows under 10 metres, the limit is 10 metres Building up is capped, which pushes space-hungry plans downward
Parking No parking spaces required on the property for duplexes, triplexes or fourplexes (since February 3, 2022) A former parking pad can become the walkout stair
Development charges Generally exempt when there are no more than four units on the residential lot A fifth or sixth unit can change the economics

The citywide fourplex permission came from amendments Council adopted in May 2023, including Zoning By-law 474-2023, which also removed the front-entrance restrictions on secondary suites. The 2025 six-unit changes are By-law 653-2025 (Official Plan) and By-law 654-2025 (zoning). You can check what your own lot allows on the City's Interactive By-Law Map, and the City will issue a Zoning Applicable Law Certificate when you apply for a zoning review.

Zoning permission is not a building permit. The City's own wording is that you still need building permits and must meet zoning rules and all City by-laws. A permitted fourplex with a basement that cannot meet the Building Code is not a fourplex you can build.

Why the basement decides the project

Run the arithmetic on a typical Toronto house and the basement becomes the swing factor.

A two-storey detached house or a semi has three usable levels: basement, ground floor and second floor. If you want three or four units and you are not adding a storey, one of those units goes in the basement, because the height cap and the lot coverage limits leave little room to add floor area anywhere else. Some owners add a third storey within the 10 metre limit. Many cannot, or the cost of building up on an old frame is worse than going down.

So the basement unit carries the plan. And older Toronto basements were never built to be lived in. A pre-1960s basement is typically 6 feet to 6 feet 8 inches to the joists, before anyone subtracts ducts, drains, a new slab and a finished floor. The legal basement apartment page walks through that stack-up in detail. The short version: the number you measure to the joists is not the number you will be living with.

The point

In a multiplex conversion, the basement is not the bonus unit. It is the unit that decides whether the other three get built.

The height question, honestly

For a single secondary suite in an existing house, the figure commonly applied is 1.95 metres, or 6 feet 5 inches, measured over the required area of the room. Do not assume that figure carries over to a multiplex. A building with three or four dwelling units is a different building under the Ontario Building Code than a house with one suite, and the applicable clause, how it is measured, and whether any compliance alternative for existing buildings applies all depend on how your designer classifies the conversion.

That is a question for your designer and the City's plan examiner, not for a contractor and not for us. What we can say is how the decision usually lands in practice:

  • If the basement is already close to whatever height your designer confirms, a shallow lowering may be enough, and that is a smaller job than full underpinning.
  • If it is 8 inches or more short, the floor has to come down below the existing footings, and that means underpinning, which is described on our page on basement lowering in Toronto.
  • If you are lowering anyway, the cost gap between the bare minimum and a height a tenant would actually choose is usually small next to the total, because the crew, the engineer and the permit are paid for either way.

We never promise a finished depth. How far a particular foundation can be taken down is the structural engineer's call, made from the soil, the existing footings and the neighbouring house.

What else the basement unit needs

Height is the expensive item. It is not the only one, and in a multiplex the list is longer than for a single suite because there are more households sharing one building.

  • Fire separation between units. Every unit has to be separated from the others, and the basement unit sits under all of them. The ceiling assembly, the stair, and every duct and pipe that passes through it become part of that separation.
  • Smoke and carbon monoxide alarms, shown on the permit drawings. The City's multiplex conversion guide asks for their locations on the floor plan for every level.
  • A way out. Every unit needs its own means of egress, and for the basement unit that usually means a separate exterior entrance. A basement walkout in Toronto costs $15,000 to $30,000 on our published range, and it is materially cheaper dug at the same time as the underpinning than added later.
  • Windows a person can get out of. Enlarged egress windows commonly run $3,000 to $7,000 installed, and again the excavation for the underpinning is the cheapest moment to do it.
  • Plumbing and drains for more units. A Plumbing Data Sheet is part of the application, and for more than two units the City wants drawings showing the fixture layout on each floor. Lowering the floor also lowers every floor drain, which is why a backwater valve is part of most of these conversations.
  • Heating, ventilation and power for more households, under their own permits.

We coordinate underpinning, lowering and walkout projects. We do not design multiplexes, issue code determinations, or tell you whether a particular unit layout will pass. Those answers come from your designer, a licensed Ontario engineer and the City.

What the City asks for on the permit

The City's multiplex conversion permit guide covers converting an existing house to a duplex, triplex, fourplex, fiveplex or sixplex. Several of the required drawings bear directly on the basement:

  • Floor plans for each level, with existing and proposed uses of every space, the foundation and exterior walls, and the structural framing above.
  • Sections showing footing and foundation wall details, the height of exterior grade above the basement floor, and the floor-to-floor and floor-to-ceiling heights.
  • A site plan with setbacks, lot coverage and grade elevations for the height calculation.
  • An Assumption of Responsibility for Engineering Content form where drawings carry a professional engineer's seal.
  • A Municipal Road Damage Deposit for projects with exterior work, and a Tree Declaration where trees could be harmed. Under the City's Tree Protection By-law, work that may injure or remove a private tree 30 centimetres or more in diameter needs a permit, which matters when the walkout is dug beside a mature maple.

Underpinning is permitted as part of the work, and the City's own residential underpinning rules apply on top: staged drawings, and a professional engineer's design where the work goes below the footing of an adjacent building within the soil's angle of repose. Our page on underpinning permits in Toronto explains that sequence, and the underpinning engineer page explains who signs what.

What the basement part costs

These are the published ranges on this site. They are not a quote, and the only honest total comes from a scope an engineer has designed.

Line Published range Note
Underpinning $500 to $750 per linear foot of wall 100 to 140 linear feet on a typical semi or small detached house is roughly $50,000 to $105,000
Structural engineering $1,500 to $8,000 Higher on a semi or tight lot that needs an adjacent-footing design
Underpinning permit fee $12.37 per linear metre of wall $214.79 minimum permit fee applies
Conversion permit fee $11.53 per square metre of interior alteration, plus $56.33 per new unit A house becoming a fourplex adds three new units, so $168.99 in unit fees
Walkout entrance $15,000 to $30,000 Cheaper bundled with the underpinning
Egress window $3,000 to $7,000 installed Per window

The fit-out of the unit itself (kitchen, bathroom, fire-rated assemblies, mechanical and electrical) sits on top, and it varies far more than the structural work does. The structural part is the most predictable line because it is measured in linear feet of wall. For how those figures move with house type, access and soil, see basement underpinning cost in Toronto.

On financing: the federal Canada Secondary Suite Loan Program was cancelled before it opened. What remains for a multi-unit conversion is an insured refinance that covers properties of up to four units, explained on our page on the Canada Secondary Suite Loan Program.

Benching will rarely carry a multiplex

Benching leaves the existing footings alone and pours a concrete step around the inside of the walls. It costs 20 to 40 percent less than underpinning, and for a rec room it is often the right answer.

For a basement unit in a multiplex it usually is not. The bench takes 18 to 24 inches off every wall, permanently. In a house under about 20 feet wide that can push a bedroom below the minimum area, and it narrows the space the stair, the fire-separated mechanical room and the egress window wells all compete for. Our comparison of benching vs underpinning has the width subtraction worked out.

Semis and row houses: the neighbour is part of the project

Much of the city's stock that is now eligible for a fourplex is semi-detached or row housing, where your foundation shares a wall with someone else's. Underpinning a party wall needs an engineered design, a sequence that protects the adjoining house, and in practice a conversation with your neighbour before the permit is filed. The underpinning semi-detached houses page covers that sequence.

A sensible order of operations

  1. Check the lot. Interactive By-Law Map, then a zoning review, so you know how many units your lot allows before paying for drawings.
  2. Measure the basement properly, to the joists, the ducts and the lowest beam, and photograph the foundation walls.
  3. Bring in a designer and a structural engineer together. The designer sets the height and layout the unit needs; the engineer says how the foundation can be taken there.
  4. Price the structural scope from the engineer's design, so every underpinning quote is for the same job. Our guide on how to compare underpinning quotes shows what to check.
  5. File one permit package that carries the conversion and the underpinning together, then build the basement first. Everything upstairs is ordinary renovation by comparison.

If you are at step 3 or 4 and want the underpinning and walkout scope coordinated, call (289) 207-6470 or use the form. We will tell you what we can and cannot answer on the phone.

Rather just talk?

(289) 207-6470

Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.

  • A firm, itemized price up front
  • Permits and engineering in the number
  • The real timeline, honestly
Call now

Get a real range

Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.

No obligation. Your details go only to our Toronto team.

Common questions

How many units can I build on my lot in Toronto?

Four units are permitted on residential lots citywide. Six-unit permissions vary by location and apply in Toronto and East York District and Ward 23 under the 2025 amendments. Check your lot on the City's Interactive By-Law Map and confirm it with a zoning review.

Can I convert my existing house into a fourplex?

Yes, in R, RD, RS, RM and RT zones an existing house may be converted to two, three or four units. You still need a building permit, and the units have to meet the Ontario Building Code, which is where older basements usually run into trouble.

Does a multiplex need parking in Toronto?

No parking spaces are required on the property for a duplex, triplex or fourplex, a rule in effect since February 3, 2022. If you do provide parking it has to meet the zoning standards for your zone.

Do I pay development charges on a fourplex?

The City says multiplexes are generally exempt from development charges and parkland cash-in-lieu provided there are no more than four units on the residential lot. A fifth or sixth unit can change that.

Is the 6 foot 5 inch basement height enough for a multiplex unit?

Do not assume it is. That figure is the one commonly applied to a single secondary suite in an existing house. A building with three or four units is classified differently under the Building Code, and your designer has to confirm the height and how it is measured for your conversion.

Do I need to underpin to add a basement unit?

Only if the basement cannot reach the height your designer confirms without going below the existing footings. A basement that is already close may need only a shallow lowering. How deep a particular foundation can go is the structural engineer's decision.

What does underpinning add to a multiplex budget?

On this site's published range, $500 to $750 per linear foot of foundation wall, which is roughly $50,000 to $105,000 for 100 to 140 linear feet, plus $1,500 to $8,000 for engineering and the City's per-metre permit fee. A firm figure needs an engineer's design.

Rather just talk?

(289) 207-6470

Tell us your basement perimeter and current ceiling height and we can give you a realistic range on the call.

  • A firm, itemized price up front
  • Permits and engineering in the number
  • The real timeline, honestly
Call now

Get a real range

Not a brochure. Tell us the basics and we will come back with numbers that reflect your actual foundation.

No obligation. Your details go only to our Toronto team.

Know the number before you dig.

Tell us your perimeter and current height. We will give you a realistic range, not a brochure.

Call (289) 207-6470
Call nowGet a range